Our Work
Case Studies
A selection of recent infrastructure projects — water main reinforcement, foul water schemes and growth networks delivered to specification.
April 2026

Thames Water · Foul Water
Bramley Sewer Scheme
A new 796m foul water rising main with directional drilling, a 1500mm chamber and ditch crossings — delivered to specification over a 10-week programme.
796m
Rising Main
646m
Drilled
£1.3M
Value
Read case study →
June 2026

Housing Development · Gravity Sewer
Watlington Growth Scheme
A new 150mm foul water gravity sewer for a housing development — delivered two weeks ahead of programme with live flows maintained throughout.
150mm
Sewer
8 wks
Delivery
310m
Bog Mats
Read case study →
Have a project in mind? Let's talk about how MAIUS can deliver it.
Contact Us